翻訳と辞書
Words near each other
・ Nuclear power debate
・ Nuclear Power Demonstration
・ Nuclear power in Albania
・ Nuclear power in Australia
・ Nuclear power in Bulgaria
・ Nuclear power in Canada
・ Nuclear power in China
・ Nuclear power in Finland
・ Nuclear power in France
・ Nuclear power in Germany
・ Nuclear power in India
・ Nuclear power in Indonesia
・ Nuclear power in Italy
・ Nuclear power in Japan
・ Nuclear power in North Korea
Nuclear power in Pakistan
・ Nuclear power in Romania
・ Nuclear power in Russia
・ Nuclear power in Scotland
・ Nuclear power in South Korea
・ Nuclear power in space
・ Nuclear power in Spain
・ Nuclear power in Sweden
・ Nuclear power in Switzerland
・ Nuclear power in Taiwan
・ Nuclear power in Thailand
・ Nuclear power in the Czech Republic
・ Nuclear power in the European Union
・ Nuclear power in the Philippines
・ Nuclear power in the United Arab Emirates


Dictionary Lists
翻訳と辞書 辞書検索 [ 開発暫定版 ]
スポンサード リンク

Nuclear power in Pakistan : ウィキペディア英語版
Nuclear power in Pakistan

As of 2012, nuclear power in Pakistan is provided by 3 licensed-commercial nuclear power plants.〔 Pakistan is the first Muslim country in the world to construct and operate civil nuclear power plants.〔Nuclear power in Pakistan, Dr. Zia H. Siddiqui and Dr. I.H. Qureshi, pp.31–33.〕 The Pakistan Atomic Energy Commission (PAEC), the scientific and nuclear governmental agency, is solely responsible for operating these power plants. As of 2012, the electricity generated by commercial nuclear power plants constitutes roughly ~3.6% of electricity generated in Pakistan, compared to ~62% from fossil fuel, ~33% from hydroelectric power and ~0.3% from coal electricity. Pakistan is one of the four nuclear armed states (along with India, Israel, and North Korea) that is not a party to the Nuclear Non-Proliferation Treaty but is a member in good standing of the International Atomic Energy Agency. Pakistan plans on constructing 32 nuclear power plants by 2050.〔http://www.thenews.com.pk/Todays-News-3-235039-32-nuclear-plants-to-produce-40000MW-PAEC〕
==History==
Professor (and later Nobel laureate) Abdus Salam, as Science Advisor to the President, persuaded President Ayub Khan, to establish Pakistan's first commercial nuclear power reactor, near Karachi. Known as Karachi Nuclear Power Plant (KANUPP), the commercial power plant is a small 137 MWe CANDU reactor, a Canadian pressurized heavy water reactor.
PAEC's Parvez Butt, a nuclear engineer, was project-director. The KANUPP began its operations in 1972, and it was inaugurated by President Zulfikar Ali Bhutto and Munir Ahmad Khan as PAEC chairman. The KANUPP which is under international safeguards is operated at reduced power. In 1969, France's Commissariat à l'énergie atomique and United Kingdom's British Nuclear Fuels plc (BNFL) contracted with PAEC to provide plutonium and nuclear reprocessing plants in Pakistan. Per agreement, the PAEC engineers were the lead designers of the power plants and nuclear reprocessing facilities. While the BNFL and CEA provided the funds, technical assistance and nuclear materials. The work on projects did not start until 1972, and as a result of India's Operation Smiling Buddha — a surprise nuclear test in 1974 — the BNFL cancelled the projects with PAEC. In 1974, PARR-II Reactor were commissioned, and its project directors were Munir Ahmad Khan and Hafeez Qureshi. The PARR-II is an indigenous reactor that was built under the auspices of PAEC's engineers and scientists.
In 1977, due to pressure exerted by U.S. Secretary of State Henry Kissinger, the CEA cancelled the projects with PAEC immediately. Without the assistance of United Kingdom and France, the PAEC engineers completed the plutonium nuclear reprocessing plant — New Labs — and the plutonium reactor — Khushab Nuclear Complex. Both power plants are commercial power plants control by PAEC. In 1989, People's Republic of China signed an agreement with Pakistan to provide 300 MWe CHASNUPP-I power plant under the IAEA safeguards. In 1990, both France and Soviet Union considered the Pakistan's request to provide the commercial nuclear power plants under the IAEA safeguards. But, after the American Ambassador to Pakistan's Robert Oakley expressed U.S. displeasure at the agreements between the Soviet Union and France, the contracts were cancelled. By the 2000, China had expanded its contract with PAEC and is currently assisting in construction of III, and IV power plants. II was completed in April 2011. Due to its growing electricity demands, the Pakistan Government ordered PAEC to set up nuclear power plants in the country. According to PAEC, the goal is to produced 8800 MW electricity by the 2030. Prime minister Yousaf Raza Gillani announced the Pakistan national energy policy in 2010 while the feasibility report was submitted in Prime Minister's Secretariat — the official residence of prime minister of Pakistan. The PAEC are currently planning to lead the construction of KANUPP-II nuclear power plant — a 1100 MWe power plant — and the KANUPP-III — 1100 MWe. While the commercial plants will be indigenously built, the preliminary work is put on hold as of 2009. In 2010, the Nuclear Power Fuel Complex (PNPFC) — a nuclear reprocessing power plant — was commissioned. PAEC led the construction, designing, and maintenance of the facility, while China and IAEA provided funds to the facility. On 26 November 2013 prime minister Nawaz Sharif performed groundbreaking ceremony for two nuclear power plants with a combined capacity of 2200 MW near Karachi.

抄文引用元・出典: フリー百科事典『 ウィキペディア(Wikipedia)
ウィキペディアで「Nuclear power in Pakistan」の詳細全文を読む



スポンサード リンク
翻訳と辞書 : 翻訳のためのインターネットリソース

Copyright(C) kotoba.ne.jp 1997-2016. All Rights Reserved.